Council Conditions
Development contributions, infrastructure upgrades and drainage requirements. Sometimes fair, sometimes not. I will push back where there is a case.
Land subdivision handled from feasibility to new titles, by a licensed cadastral surveyor
Subdividing land in Auckland is less about the surveying than the consent. The fieldwork on a straightforward two-lot subdivision takes a day. Everything after that is Auckland Council, and that is where most people come unstuck.
I handle the whole subdivision process: feasibility against the Unitary Plan, the site survey, the resource consent application, section 223 and section 224c certification, and the survey plan lodged with LINZ for your new titles.
Almost never the survey. It’s more likely to be one of these:
Development contributions, infrastructure upgrades and drainage requirements. Sometimes fair, sometimes not. I will push back where there is a case.
Landslide and instability, flooding and overland flow paths, volcanic viewshafts, heritage. Each one adds assessment work before consent.
If your stormwater or wastewater crosses a neighbour’s property, easements may have to be settled before titles can issue.
New vehicle crossings, drainage connections and retaining all need sign-off before 224c.
A recent subdivision I completed had all of it: a landslide assessment overlay, an overland flow path, and private drainage on adjoining land. The conditions were steep, and it still got through.
You do not always need to subdivide. Depending on the zone and site, a minor dwelling or granny flat may be the better option, and the rules changed in 2025 to make some of these considerably easier to consent.
I can tell you which path suits your property before you spend money on the wrong one.
Have the property address handy and an idea of what you are proposing. That is enough for me to give you a useful answer over the phone.